| A. 77 Million ADB Loan |
| Description |
| Procurement of smokemeters and Gas Analyzers for the LTO district offices covered in the Metro Manila Air Shed |
| Objective |
| To provide smoke test equipment for the LTO district offices in the Metro Manila Air Shed to be used for the following: |
| For 2002 |
For 2003 |
| 1) Conduct test prior to registration |
1) Conduct adjudication test |
| 2) Conduct adjudication test |
2) Conduct roadside inspection test |
| 3) Conduct roadside inspection test |
3) Conduct monitoring test of PETC tests |
| 4) Conduct monitoring test of PETC |
|
| 5) Conduct test for CCES |
|
|
| Status |
| Bidding documents are being prepared |
| Plans |
| Distribution Of Opacimeters and Gas Analyzers By Region |
|
| Region |
Opacimeters |
Gas Analyzers |
| NCR |
35 |
33 |
| III |
16 |
14 |
| IV |
14 |
12 |
| Others |
32 |
25 |
|
|
| B. Private Emission Testing Centers |
| Description |
| Accreditation and authorization of private emission testing centers nationwide |
| Objective |
| To be used for the following: |
| For 2002 |
For 2003 |
| 1) Conduct test prior to registration |
1) Conduct test of imported vehicles |
| 2) Conduct test for imported vehicles |
2) Conduct voluntary test |
| 3) Conduct voluntary test |
3) Conduct test of apprehended vehicles |
| 4) Conduct test of apprehended vehicles |
|
|
| Status |
| Five (5) testing centers have been authorized to date |
| Plans |
| To be able to establish 750 stations for Metro Manila and 700 stations outside Metro Manila |
| C. Motor Vehicle Inspection System |
| Description |
| An MVIS expansion project that will cover the development of a systematic and comprehensive vehicle testing system |
| Objective |
| To expand and upgrade the existing MVIS through a public-private partnership such as the BOT Law or its variant schemes |
| Status |
| Deliberated and was able to get 1st pass approval at the NECA ICC Technical Board on March 6, 2002 and at the Cabinet level on March 25, 2002. Request For Proposal preparation is ongoing |
| Plans |
| To be able to construct 208 MVIS lanes nationwide by the end of the 15-year concession period |